Blauberg CP-2
- Description
- Modifications
- Downloads
Description
Description
FEATURES
The drain pump provides extraction and discharge of condensate that may form in the heat exchanger during heat recovery. |
MOUNTING
For CP-2 pump both horizontal and vertical installation is possible. The pump drain pan must be installed in the horizontal position only, in compliance with the user’s manual. |
|
DESIGN | ||
1 – condensate water inlet2 – air intake fitting for ∅ 4x6 hose3 – condensate outlet fitting for ∅ 4x6 hose4, 8 – fitting for ∅ 4x6 connecting hose | 5 – fitting for a drain pipe for ∅ 4x6 hose6 – removable terminal block7 – mounting plate9 – pump lock10 – removable electric cable socket |
Modifications